Category: Jeremy Corbyn

  • It’s difficult to fault Jeremy Corbyn and the Labour Party

    Spread the love

    It’s difficult to fault Jeremy Corbyn and the Labour Party’s campaigning in the current UK general election. “For the many. Not the few”, the excessively rich to pay more in tax.

    They’re saying it like it is – a rigged economy for the benefit of a tiny minority at the expense of the many, that the Conservative party is the party of the privileged elite.

    Rupert Murdoch: “When I go into Downing Street, they do what I say; when I go to Brussels, they take no notice.” source

    Rupert Murdoch accused of enjoying ‘astounding access’ to Downing Street

     

  • Gambling on Jeremy Corbyn

    Spread the love

    I have gambled on UK politics and won big over the recent few years. Please check for yourselves: there have not been bets available on Jeremy Corbyn as next prime minister for months. The best odds currently is 9:1 with a maximum stake of £62.50.

    Odds are very poor. Bookies would be offering upwards of 50:1 if the election was regarded as a foregone conclusion.

  • Hinkley Point C

    Spread the love

    Leader of the Opposition Jeremy Corbyn should be commended in opposing and Prime Minister Theresa May should be commended in showing caution and wisdom in the proposed Hinkley Point C nuclear power station. There are so many causes for concern in these proposals. Hinkley Point C should not proceed at any cost and there should be thorough, clear and sober assessment.

    The proposed Hinkley Point C reactors (2 of them) are a new and unproven design of reactor, the European Pressurized Reactor (EPR). EPRs are a form of Pressurised Water Reactor.

    The four EPRs already being built have all experienced construction problems and are all uncompleted, over-budget and delayed by years.

    https://en.wikipedia.org/wiki/EPR_(nuclear_reactor)

    Four EPR units are under construction. The first two, in Finland and France, are both facing costly construction delays (to at least 2018). Construction commenced on two Chinese units in 2009 and 2010.[1] The Chinese units were to start operation in 2014 and 2015,[2] but are now expected to come online in 2017.[3]

    Olkiluoto 3 in Finland was scheduled to go online in 2009. It is currently expected to start operation in 2018. source It is hugely over-budget. source

    Flamanville 3 in France was due to start operation in 2012. It is currently delayed until late 2018. source

    These dates of 2018 should be regarded as optimistic spin likely to be superseded with later dates.

    Flamanville‘s lid and base to the reactor vessel are flawed and below the required standard, weakened by excessive carbon content in the steel. There are suggestions that the French nuclear safety authority (ASN) may require that the vessel is replaced or even that the project is abandoned.

    Areva aware ‘as early as 2006’ of serious fault in nuclear reactor destined for UK

    UPDATE 2-French regulator delays decision on EDF Flamanville reactor to end-2016

  • Jeremy Corbyn seems to be doing fine …

    Spread the love

    My analysis is that the disenfranchised – through being denied the ability to vote for anybody that represented their interests – are no longer disenfranchised. I suggest that the claims that a Corbyn government is unelectable is very seriously challenged. (I’m being polite ;)

     

    Corbyn:”It’s not about me. It’s about what we have to do together”

    …

    “We’re all going to have to work hard together”